Zueitina Oil Company require to convey 1,500 MMSCFD of gas from 103A to the Coastal Network at Marsa-Al-Bregaby 2012. Penspen undertook the detailed design for the 206km, 42" diameter pipe line and a Concept study, Front End Engineering Design (FEED) for the associated 103A gas gathering, pressure reduction & metering (PRMS) and 103A compression facilities.
Penspen provided the following services: