10 km 10" diameter pipeline and 10 km 6" diameter pipeline. Gas process and metering equipment. Replacement of 60 plus burners in existing furnaces and associated control systems.
Integration with 3 separate control systems. Fibre Optic cable and integration with existing telecommunications system. Equipment building and associated building Services.