The 4,300 km pipeline is proposed under the NEPAD initiative to connect to gas resources in Nigeria and Algeria and transport them to consumers accessible from the pipeline along its route and at its terminal point on the Mediterranean coast of Algeria.
The project is being executed in Joint Venture with IPA Energy Consulting.