Feasibility Study for the Gendalo Field - Deepwater (FEED) 

 

The first phase of the Gendalo Field development project, part of the giant deepwater Gendalo-Gandang gas field complex offshore East Kalimantan Indonesia. The gross resource potential for the Gendalo-Gandang complex is at least 2.0 to 2.5 trillion cubic feet of gas, plus an associated 50 to 150 million barrels of condensate. The first phase will be designed to produce 250-300 Million Standard Cubic Feet per day (MMscfd) and is targeted for a (Q3) 2007 start up depending on government approvals.

It is proposed that the Gendalo field will be developed utilising, initially, three drill centres with subsea wells in up to 5500 feet sea water (fsw) tied back to a statically moored Floating, Production, Storage and Offloading (FPSO) vessel in 3700 fsw. Processed gas will be exported to the beach.