Pande Field Development Project 

 

Conceptual Design and Consultancy Services of gas gathering network, trunkline and associated process facilities between the Pande Gas Field and a Central Processing Facility (CPF) at Temane.

50 km of 6" to 16" diameter pipelines for the gas gathering network within the Pande Gas Field, and 45 km of 30" pipeline between the gas field and the CPF.

Associated facilities include a slug catcher, filtration and metering system, and communications system.