Saxon Development Detailed Design 

 

The Saxon development undertaken in 2006 consisted of two production wells, tied back to an adjacent Drill Centre 8 (DC8) Manifold, and a new infill subsea production well 21/24-TU tied into the existing DC3 Manifold. Flexible production and gas lift flowlines and a combined control/ CI umbilical linked the new DC8 Manifold to the existing DC7 Manifold, for onwards transmission to the Triton Floating Production, Storage and Offloading vessel via the Pict, Clapham, Guillemot West and Northwest fields infrastructure.

Tie-in operations were achieved via the installation of rigid production and gas lift 'Z-spools' at each tree and at the DC8 Manifold, in conjunction with flexible production and gas lift jumpers and a controls/ CI jumper bundle.