The Babbage field is located in 40-45m of water and has a design life of 25 years as a minimum facility wellhead platform, which will be defined as a normally unmanned installation after the first two years.
The initial 3 wellheads may be extended to a maximum of 5, and the platform export will be via a wet gas venturi meter into a new 12” 28km carbon steel pipeline, connecting to the existing West Sole Bravo (WSB) 14” subsea tee.