The list of projects below is a selection of project types in a cross section of geographical locations


Displaying related projects for: Concept

Mozambique

Pande Field Development Project

Conceptual Design and Consultancy Services of gas gathering network, trunkline and associated process facilities between the Pande Gas Field and a Central Processing Facility (CPF) at Temane

Concept

Download PDF

UK

Babbage Field Development – Preliminary Pipeline Design

The Babbage field is located in 40-45m of water and has a design life of 25 years as a minimum facility wellhead platform, which will be defined as a normally unmanned installation after the first two years. The initial 3 wellheads may be extended to a maximum of 5, and the platform export will be via a wet gas venturi meter into a new 12” 28km carbon steel pipeline, connecting to the existing West Sole Bravo (WSB) 14” subsea tee

Concept

Download PDF

UAE

Abu Dhabi International Airport - Fuel Farm Expansion Project

Conceptual design for expansion of the fuel farm at Abu Dhabi International Airport to provide aircraft fuel during the phased expansion of the airport until the year 2045

Concept

Download PDF

UK

Oyster 2 Pipelines Conceptual Study

Oyster 2 is an expansion of the Oyster 1 prototype installed at the EMEC test site in Orkney which consists of a simple steel Oscillating Wave Energy Converter (WEC), or pump, fitted with double acting water pistons, deployed near-shore in depths around 10-12m. Each passing wave activates the pump which delivers high pressure water via a sub-sea pipeline to the shore. Onshore, high-pressure water is converted to electrical power estimated using proven, conventional hydro-electric generators

Concept

Download PDF

Libya

103A to Coastal Network Gas Pipeline

1500 MMSCFD 42" diameter pipe line running 215km from 103A to the Coastal Network at Brega, incorporating gas gathering, compression facilities and gas transmission

Concept

Download PDF

UK

Rita Preliminary Design

The E.ON Ruhrgas development required a preliminary engineering study to confirm the route, pipeline material selection and detail a specification for procurement of the Long Lead Items (LLIs) to meet the design life of 15 years. The engineering study included field development drawings of the pipeline routing, approaches and crossings, wellhead tie-ins and functional specifications to procure LLIs

Concept

Download PDF

UAE

Jebel Ali Airport Aviation Fuel Depot Concept and FEED Project

Development of aviation fuel depot and supply system for new airport

Concept  |  FEED

Download PDF

Indonesia

Feasibility Study for the Gendalo Field - Deepwater (FEED)

The first phase of the Gendalo Field development project, part of the giant deepwater Gendalo-Gandang gas field complex offshore East Kalimantan Indonesia. It is proposed that the Gendalo field will be developed utilising, initially, three drill centres with subsea wells in up to 5500 feet sea water (fsw) tied back to a statically moored Floating, Production, Storage and Offloading (FPSO) vessel in 3700 fsw. Processed gas will be exported to the beach

Concept

Download PDF

UK

Puffin HP/ HT Pipe-in-Pipe Study

Andrew Palmer & Associates were contracted by Shell to perform an evaluation of proprietary and generic pipe-in-pipe insulation systems for HP/HT service, using the Puffin export line as a case study

Concept

Download PDF