Penspen | Related Projects 

The list of projects below is a selection of project types in a cross section of geographical locations


Displaying related projects for: Detailed Design

UAE

Abu Dhabi Crude Oil Pipeline (ADCOP) Project

The ADCOP project will transport up to 1.8MMBPD of crude oil from the main producing areas in Abu Dhabi to Fujairah on the East coast of the UAE. The project facilities include a 370km long, 48" diameter oil export pipeline

Detailed Design

Download PDF

UK

Carrack East Detailed Design

Shell U.K. Limited (Shell) is planning the development of the remaining small gas opportunities within its Southern North Sea portfolio, spread over both the UK and Dutch sectors. The development of these gas prospects is commonly known as the SWEEP Project. Low cost subsea system solutions are essential in order to make the development of these gas pockets economically viable

Detailed Design

Download PDF

Egypt

Design Engineering Consultancy for Natural Gas Compressor Station at Al-Arish

Contract for design engineering consultancy for natural gas compressor station at Al-Arish, North Sinai, Egypt

Detailed Design

Download PDF

UK

Auk North Detailed Design

The Auk North field is developed as a direct subsea tie-back to the Talisman-operated Fulmar 'A' platform via a subsea manifold at Auk North, with insulated production pipeline, combined electro-hydraulic/ chemical injection umbilical and power cable to/ from Fulmar. The subsea lines tie-in to a new conductor riser assembly located on Fulmar 'A'

Detailed Design

Download PDF

Libya

Brega to Zueitina Terminal New Fuel Gas Pipeline

Detailed design, procurement and construction supervision for the associated works including pipelines and conversion of process plant

Detailed Design

Download PDF

UK

Babbage Field Development Detailed Design

The Babbage field is located in the north-west of the UK SNS in UK Block 48/2, Licence P456, approximately 80km northeast of Dimlington (Easington). The field is in 40-45m of water and is approximately 28km northwest of the BP-operated West Sole WB platform. It is planned to develop the field through a North West platform location with the potential for further wells tied-back from the South East of the reservoir or third party fields

Detailed Design

Download PDF

UK

Rita Detailed Design

The Rita development involves a single bilateral subsea horizontal well, tied back to the ConocoPhillips operated Caister Murdoch System (CMS) subsea infrastructure at Hunter via a circa 14 km long, 8-inch NB carbon steel flowline. The Hunter wellhead has an existing daisy chaining facility with double valve isolation which allows for tie-in of the production flowline via a tie-in spool

Detailed Design

Download PDF

UK

Saxon Development Detailed Design

The Saxon development undertaken in 2006 consisted of two production wells, tied back to an adjacent Drill Centre 8 (DC8) Manifold, and a new infill subsea production well 21/24-TU tied into the existing DC3 Manifold. Flexible production and gas lift flowlines and a combined control/ CI umbilical linked the new DC8 Manifold to the existing DC7 Manifold, for onwards transmission to the Triton Floating Production, Storage and Offloading vessel via the Pict, Clapham, Guillemot West and Northwest fields infrastructure

Detailed Design

Download PDF

Holland

L09 Detailed Design

The development for the L09 Area development consisted of two platforms L09-FA and L09-FB, evacuating well fluids via one pipeline to the existing host facility L09-FF

Detailed Design

Download PDF

UK

Caravel & Shamrock Detailed Design

Shell Exploration and Production (Shell Expro) undertook the development of the Caravel Area Cluster which is located in the UK Southern North Sea about 115 km north east of Bacton and 10 km west of the UK-Netherlands border

Detailed Design

Download PDF

Tunisia

Miskar Gas Field Development

The Miskar Gas Field is located in the Mediterranean Sea off the coast of Tunisia. It lies in 62m of water approximately 125km offshore in the Gulf of Gabes. The development project included a drilling and production platform linked to a new onshore terminal. A 24-inch export pipeline transmits gas and condensate under wellhead pressure to a new onshore gas plant

Detailed Design

Download PDF