Displaying related projects for: FEEDSonangol has contracted Penspen to carry out the Design Audit for the Barra Do Dande Oceanic Terminal in Angola. The Oceanic Terminal, which will include new and improved fuel storage and loading facilities, will make up a large part of the new green field port of Barra Do Dande, set to be one of the largest commercial ports in Africa. Detailed Design | FEED New fuel storage tanks and new road loading and pipeline distribution terminal on the existing Buncefield site at Hemel Hempstead in Hertfordshire, UK. Client: Total UK Limited
FEED Austria, Bulgaria, Hungary, Romania, Turkey The Nabucco natural gas pipeline constitutes a dedicated gas transit and transportation pipeline from Turkey to Austria via Bulgaria, Romania and Hungary. Total length is more than 3000 km. FEED | Project Management The Greece-Italy Natural Gas Interconnector is a 580 km and 42" diameter high pressure natural gas pipeline from Kotomini in Eastern Greece to Thesprotia in Western Greece. FEED Marathon Oil (UK) Limited are currently developing the East Brae facility to allow the tie-back of the BP Devenick Development. Andrew Palmer & Associates, the offshore division of the Penspen Group, has been awarded the FEED for this project. FEED Shell U.K. Limited (Shell) is planning the development of the remaining small gas opportunities within its Southern North Sea portfolio, spread over both the UK and Dutch sectors. The development of these gas prospects is commonly known as the SWEEP Project. Low cost subsea system solutions are essential in order to make the development of these gas pockets economically viable FEED Gas pipeline to receive gas from the new LNG Terminal at Rayong/Maptaphutand deliver to the existing gas transmission system at the Wang Noi–Kaeng Khoi pipeline. Penspen are providing Front End Engineering Design (FEED) Linepipe procurement support and EPC Tender assistance to Petroleum Authority of Thailand - PTT FEED Auk North is a 4 - 6 well step out development using downhole Electrical Submersible Pumps (ESPs) to connect the wellheads via subsea tie in spools to a production manifold and protection structure. The manifold includes a test header with multi-phase flowmeter, umbilical termination and control system. The export flowline from the manifold is a subsea tie back terminating at a new caisson riser at the bridge linked Fulmar Advance Drilling (AD) platform FEED PMC services for the EPC and Commissioning of a 185km 36" & 270km, 32" diameter gas transmission pipeline from Conoco Philips gas fields to PLN's power plants in West Java. Mountainous area with rainforest FEED | Project Management Project Management Consultancy Services for the installation of a new Gas Booster Station at Jabung on the 28" dia 468 km Grissik to Singapore pipeline FEED | Project Management Salt cavity storage project including 38km gas pipeline, 19km brine pipeline, gas dehydration facilities, gas compressors and general treatment facilities Feasibility | FEED | Project Management The project scope includes 150km high pressure pipeline 18" in diameter, plus block valve installations and telecommunications infrastructure. The pipeline will provide security of supply to both Northern Ireland and the Republic of Ireland by linking Interconnectors 1 and 2 to the Scotland Northern Ireland Pipeline (SNIP). The pipeline would also make gas available to towns en-route including Newry, Armagh, Banbridge, Portadown, Lurgan, and Antrim FEED | Project Management The Burghley development lies approximately 8.5 km to the northeast of the Balmoral Floating Production Vessel (FPV). CNR proposed to develop the field by sub-sea tie-back to the existing Balmoral facility, and review of options for the risers at Balmoral was included in the scope of work FEED The Tweedsmuir South (J5) field is located some 5km due south of Tweedsmuir. For this development, a single production manifold shall be installed at the drill centre location designed to accommodate up to 2 production wells (one initial plus one spare) and allow for the tie-in for a future field development. Tieback shall be directly to the Tweedsmuir manifold via a single 8" production pipeline, again comprising of a pipe-in-pipe arrangement FEED Development of aviation fuel depot and supply system for new airport Concept | FEED |