News Archive
-
Risk-Based Inspection Study of Heritage Assets
Penspen demonstrates their risk assessment capabilities by providing the client risk-based inspections and studies to…
Read article -
Risk Assessment of Geohazards
Challenge The gas pipeline operator manages a 24-inch Yetagun pipeline that exports gas from the…
Read article -
Management & Assessment of Cracks in Pipelines
Challenge Penspen were contracted to identify the damage mechanisms associated with cracking in a gas…
Read article -
Inverness Airport Case Study
Background/Introduction Inverness Airport, owned and operated by Highland and Island Airport Limited (HIAL), is involved…
Read article -
Pipeline Pigging Assessment
Challenge The client operates a gas plant in a remote location in the Kurdistan Region…
Read article -
Database Management and Baseline Integrity Assessment
Challenge The client is engaged in the extraction of Natural Gas Liquids (NGLs) from associated…
Read article -
Life Extension Study of a Pipeline System
Challenge The client operates a pipeline system running from a gas separator plant to a…
Read article -
Life Extension Study of a Production Field
Challenge With the production field approaching the end of its design life in 2021, the client contracted Penspen to perform a life extension…
Read article -
Risk Based Inspection and Integrity Analysis of a Compression Station
Risk Based Inspection (RBI) and integrity anaysis of a compressor station located in the Americas…
Read article