Home > Carbon Capture > CCUS and H2 for a Large-Scale Industrial Cluster

CCUS and H2 for a Large-Scale Industrial Cluster

Carbon capture & storage, and hydrogen concept solutions to help reach net zero in the UK.

Image of a processing plant behind a green tree
Location

United Kingdom

Client

Industrial Cluster

Sectors
  • Onshore
  • Offshore
Services
  • Carbon Capture, Utilisation and Storage (CCUS)
  • Hydrogen Concept
  • Project Management Consultancy (PMC)
  • Feasibility Study
  • Pre-FEED
  • FEED
  • Process Safety

Overview

The client is one of the UK’s largest cluster by industrial emissions, and is the location of a wide range of heavy industrial plants – including oil refining, steel manufacture, cement, chemicals and others – making it a potential location for a Carbon Capture, Utilisation and Storage (CCUS) cluster. The site has additional access to suitable CO2 storage sites in the Southern North Sea.

Carbon Capture & Storage Project:
Following the successful completion of feasibility study & pre-FEED by Penspen in 2022, the team have been selected by the client to further deliver the following Project Management Consultancy (PMC) services:

  • Technical Support to Voluntary Carbon Credits (VCCS)/Development Constent Order (DCO) Application
  • 55km CO2 24” pipeline route from point A to B
  • The addition of new project team members: Construction Manager, Senior Pipeline Engineer, and Senior Project Engineer to provide significant impact on project deliverables
  • FEED/EPC for the onshore and offshore pipeline and plaftform

Hydrogen Concept Project:
The client operates a power station with capacity to deliver electricity to the UK market and its national chemical parks. As part of Net Zero 2050, developing projects to decarbonise industry is a top priority, and Penspen have been selected to provide the following services to help drive the energy transition:

  • Conceptual study for delivering up to 30% blend hydrogen to combined cycle gas turbine (CCGT) units
  • Hydrogen pipeline routing optioneering
  • Process flow assurance
  • Blending station design review
  • Building structural analysis
  • Process safety (QRA, HAZID)
  • Development of basic engineering package
  • Capex estimate
  • Engineering finish forecast

Contact our Energy Transition Team

REACH NET ZERO
Penspen
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.