FEED Services for Aviation Fuel Farm Rehabilitation Project at Erbil International Airport
Enhancing Fuel Infrastructure in the Kurdistan Region of Iraq
Project Background
Penspen was awarded a contract by an international oil and gas company to provide Front-End Engineering Design (FEED) services for the enhancement of fuel farm facilities at Erbil International Airport, the main airport serving Erbil city in the Kurdistan Region of Iraq. With one of the world’s longest runways, the airport serves as a critical hub along the modern trade routes.
Services
Penspen’s Middle East team carried out a series of FEED services to optimise the efficiency, safety, and reliability of the airport’s fuel infrastructure. The project covered key fuel farm components, including:
- Bridger offloading & Refueler Loading
- Storage Tanks
- Test Rigs
- Pump House
- Fire Water & Foam System
- Oily Water Separator
- Electrical Systems
Result
Leveraging our extensive experience in aviation fueling projects across the Middle East and Africa, along with a deep understanding of the client’s goal to enhance fuel farm facilities at Erbil International Airport, our engineering team successfully minimised the design period, reduced CAPEX costs, and effectively future-proofed Erbil International Airport’s fuel supply to meet the growing demands of the Kurdistan region’s aviation industry.
Related Projects
Rehabilitation & Integrity Reinstatement of Flowlines – Bab & Asab Fields
Discover how Penspen is supporting the rehabilitation and integrity reinstatement of flowlines across ADNOC Onshore’s Bab and Asab fields, helping safeguard production, reliability and long-term...
Detailed Engineering and Capacity Upgrade of the Feruka–Harare Pipeline System
Discover how Penspen has supported the Feruka–Harare Pipeline System in Zimbabwe for over 20 years and is now optimising capacity upgrades to meet growing regional fuel demand and improve network...
Protecting Pipeline Integrity Along UAE Emirate Metro Expansion Corridors
Discover how Penspen is providing independent technical assurance to protect pipeline integrity as metro networks expand across the UAE emirates, helping transport infrastructure and existing energy...
Ductile Fracture Control Study for CO2 Pipeline System
Penspen selected to deliver Ductile Fracture Control Study for CO2 Pipeline System at one of the largest and oldest onshore oil fields in the United Arab...



