Home > Asset Integrity > Gap Analysis for Aviation Fuel Systems at Hamad International Airport

Gap Analysis for Aviation Fuel Systems at Hamad International Airport

Optimisation of critical energy infrastructure to meet growing aviation fuel demands

Image of Industrial Storage Tanks Against Clear Sky.
Location

Hamad International Airport

Client

Dar Al Handasah

Services
  • Gap Analysis
  • Demand Analysis
  • Data Collection & Review
  • Fuel Expansion Capacity Support

Project Background

DAR, one of the world’s leading consultancies, awarded Penspen a contract to conduct a comprehensive gap analysis for the aviation fuel systems at Hamad International Airport in Qatar.

This analysis is a key element of the airport’s master plan, which outlines its long-term strategy for development and expansion. The primary objective is to evaluate whether the existing aviation fuel system can support the airport’s projected growth and future demand. Penspen’s assessment will help determine if updates to the master plan are necessary to ensure the airport’s continued efficiency, safety, and capacity to accommodate increasing air traffic over the next 20 years.

Services

Engineers from Penspen’s regional head office in Abu Dhabi, UAE, oversaw the project and delivered key services as part of the gap analysis scope of work, including:

  • Data Collection & Review – Evaluating existing aviation fuel infrastructure.
  • Demand Analysis – Forecasting future fuel requirements based on air traffic projections.
  • Capacity Assessment – Determining system capabilities and identifying any gaps.
  • Optimisation Recommendations – Providing technical insights into operational efficiency and potential upgrades.

Result

Penspen’s gap analysis, based on air traffic projections, confirmed that the existing aviation fuel facilities are sufficient for the ultimate phase outlined in the master plan. As a result, no additional investment is required, saving the client significant CAPEX. With the updated master plan, the airport operator now has a clear, data-driven roadmap for future development and investment.

Related Projects

pipeline and power lines against the background of blue sky and clouds.
Find Out More
17-06-2026

Detailed Engineering and Capacity Upgrade of the Feruka–Harare Pipeline System

Discover how Penspen has supported the Feruka–Harare Pipeline System in Zimbabwe for over 20 years and is now optimising capacity upgrades to meet growing regional fuel demand and improve network...

Learn More
High-speed train with motion blur
Find Out More
11-05-2026

Protecting Pipeline Integrity Along UAE Emirate Metro Expansion Corridors

Discover how Penspen is providing independent technical assurance to protect pipeline integrity as metro networks expand across the UAE emirates, helping transport infrastructure and existing energy...

Learn More
Image of white pipeline against blue skies
Find Out More
23-02-2026

Ductile Fracture Control Study for CO2 Pipeline System

Penspen selected to deliver Ductile Fracture Control Study for CO2 Pipeline System at one of the largest and oldest onshore oil fields in the United Arab...

Learn More
Image of Oil Refinery with blue skies
Find Out More
11-08-2025

Detail Engineering Services for the Upgrade of North East Bab Oilfield Facilities

Penspen awarded Detail Engineering Services for the Upgrade of North East Bab Oilfield...

Learn More