Home > Engineering > Miller DF1, CCS Project

Miller DF1, CCS Project

Two men in PPE and hard hats with a pipeline in the background
Location

St Fergus

Client

BP

Sectors
  • Engineering
Services
  • Inspection planning
  • Site visits
  • Assessment of pipeline

Challenge

BP’s project included a ‘proof of concept’ and demonstrated an industrial scale CO2 system with green power generation.

Services

  • Site visits
  • Preparatory work at St Fergus
  • Assessment of suitability of the pipeline for CO2 transportation
  • Inspection planning

Solution

The project utilised CO2 flood to maximise the economic recovery of further hydrocarbons from the Miller field and contribute to organisational capability in upstream CO2 engineering and operations. Part of the project was to reuse the Millar pipeline between St Fergus and the Millar field. Penspen’s scope was to assess the feasibility of this.

Result

The project provided a highly reliable and assured system to store all of the CO2 produced by DF1 in Miller reservoir.

Speak to Our Experts

Contact Us
Penspen
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.