PMC Services for CO2 Recovery FEED Project
Challenge
To evaluate the options for CO2 recovery from the gas plant. This included evaluating CO2 take off from the Tail Gas Treating Unit (TGTU) overhead gas either upstream (pre-combustion) or downstream (post-combustion) of the incinerator, along with identifying the best process technology for recovering CO2.
Services
Project Management Consultancy (PMC) services for a Middle East Network Operations Centre (NOC).
Solution
Penspen provided process licensor technology evaluation and selection to ensure optimum CO2 recovery and consideration to CAPEX, OPEX and proven process technology.
Result
The selected process was a pre-combustion without oxy fuel operation.