"*" indicates required fields
The Principles of Risk-Based Inspection
Safety-focused and cost-effective, Risk-Based Inspection (RBI) as an inspection scheme targets threats to the integrity of critical energy assets. An essential part of Asset Integrity Management, the methodology enable teams in complex processing industries to find the answers related to inspection activities.
Discover how the RBI methodology can boost reliability of your assets and help develop risk mitigating strategies that work in our new paper ‘Risk-Based Inspection: The Steps to Effective Asset Integrity Management’.
Download the free paper by completing the form.
Related Insights
Managing Electrical Interferences in Pipelines – A Practical and Cost-Effective Approach
The rapid expansion of AC/DC transmission networks, electrified transportation systems and pipeline infrastructure has increased the spatial overlap among these...
Exceedance Probability Modeling in Pipeline Integrity Using Big Data Techniques for Crack Type Anomalies
In our latest technical insight, Penspen Asset Integrity experts explore how exceedance probability modelling and big data techniques can be applied to crack-type anomalies to support risk-based...
The Pathway Towards Hydrogen Repurposing
In the 30th issue of Dar Magazine, Penspen’s Head of Asset Integrity – East Region, Nick Molnar, explains how historical hydrostatic test data can be used to assess and prioritise pipeline...
Curiosity, Commitment, and Corrosion: Our People – Yureis Villasmil
Passionate about personal development, integrity engineer Yureis shares how her her work contributes to the safe and sustainable delivery of energy throughout Latin America. ...



