Asset Integrity
-
Find out moreLife Extension Study of a Pipeline System
Challenge The client operates a pipeline system running from a gas separator plant to a…
-
Find out moreLife Extension Study of a Production Field
Challenge With the production field approaching the end of its design life in 2021, the client contracted Penspen to perform a life extension…
-
Find out moreRisk Based Inspection and Integrity Analysis of a Compression Station
Risk Based Inspection (RBI) and integrity anaysis of a compressor station located in the Americas…
-
Find out moreIntegrity Assessment of a 12” Pipeline
Challenge The 12″ pipeline runs refined product in the terminal. The pipeline is 1.123 km…
-
Find out more2019 Annual Technical Integrity Assessment Reports
Challenge To provide an Annual Technical Integrity Assessment (TIA) report covering the year 2019 operations…
-
Find out more2016 Annual Technical Integrity Assessment Reports
Challenge To provide Technical Integrity Assessment (TIA) report covering latest year of integrity management (2016)…
-
Find out moreIntegrity Management and Compliance with Regulatory Requirements
Challenge An offshore operator has developed a field as a tieback. The pipeline system consists…
-
Find out moreDevelopment of a Risk Based Inspection Scheme
Challenge To review and update the existing Risk Based Inspection (RBI) scheme for pipelines system…
-
Find out moreQRA for High Pressure Gas Pipelines
We carried out a Quantitative Risk Assessment (QRA) for a pipeline running high pressure natural…



