Home

Our Work

  • Killingholme & Cottage Power Stations Hydrogen Assessment Study

    Hydrogen assessment study for the Killingholme pipeline and Cottage power stations…

    Find out more
  • Life Extension Study of a Production Field

    Challenge With the production field approaching the end of its design life in 2021, the client contracted Penspen to perform a life extension…

    Find out more
  • PMC Services for CO2 Recovery FEED Project

    Challenge To evaluate the options for CO2 recovery from the gas plant. This included evaluating…

    Find out more
  • Miller DF1, CCS Project

    Challenge BP’s project included a ‘proof of concept’ and demonstrated an industrial scale CO2 system…

    Find out more
  • Brae B, CCS Project

    Challenge Marathon Oil UK (MOUK) developed a submission as a part of the UK government’s…

    Find out more
  • Carbon Capture and Storage for National Grid in the UK

    National Grid commissioned Penspen to undertake a research and development feasibility assessment into the transporting…

    Find out more
  • Risk Based Inspection and Integrity Analysis of a Compression Station

    Risk Based Inspection (RBI) and integrity anaysis of a compressor station located in the Americas…

    Find out more
  • Integrity Assessment of a 12” Pipeline

    Challenge The 12″ pipeline runs refined product in the terminal. The pipeline is 1.123 km…

    Find out more
  • 2019 Annual Technical Integrity Assessment Reports

    Challenge To provide an Annual Technical Integrity Assessment (TIA) report covering the year 2019 operations…

    Find out more
Penspen
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.