Asset Integrity

  • Inverness Airport Case Study

    Project Background Inverness Airport, owned and operated by Highland and Island Airport Limited (HIAL), is…

    Find out more
  • Pipeline Pigging Assessment

    Challenge The client operates a gas plant in a remote location in the Kurdistan Region…

    Find out more
  • Database Management and Baseline Integrity Assessment

    Challenge The client is engaged in the extraction of Natural Gas Liquids (NGLs) from associated…

    Find out more
  • Life Extension Study of a Pipeline System

    Challenge The client operates a pipeline system running from a gas separator plant to a…

    Find out more
  • Life Extension Study of a Production Field

    Challenge With the production field approaching the end of its design life in 2021, the client contracted Penspen to perform a life extension…

    Find out more
  • Risk Based Inspection and Integrity Analysis of a Compression Station

    Risk Based Inspection (RBI) and integrity anaysis of a compressor station located in the Americas…

    Find out more
  • Integrity Assessment of a 12” Pipeline

    Challenge The 12″ pipeline runs refined product in the terminal. The pipeline is 1.123 km…

    Find out more
  • 2019 Annual Technical Integrity Assessment Reports

    Challenge To provide an Annual Technical Integrity Assessment (TIA) report covering the year 2019 operations…

    Find out more
  • 2016 Annual Technical Integrity Assessment Reports

    Challenge To provide Technical Integrity Assessment (TIA) report covering latest year of integrity management (2016)…

    Find out more
Penspen
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.