-
Find out morePMC Services for CO2 Recovery FEED Project
Challenge To evaluate the options for CO2 recovery from the gas plant. This included evaluating…
-
Find out moreMiller DF1, CCS Project
Challenge BP’s project included a ‘proof of concept’ and demonstrated an industrial scale CO2 system…
-
Find out moreBrae B, CCS Project
Challenge Marathon Oil UK (MOUK) developed a submission as a part of the UK government’s…
-
Find out moreCarbon Capture and Storage for National Grid in the UK
National Grid commissioned Penspen to undertake a research and development feasibility assessment into the transporting…
-
Find out moreRisk Based Inspection and Integrity Analysis of a Compression Station
Risk Based Inspection (RBI) and integrity anaysis of a compressor station located in the Americas…
-
Find out moreIntegrity Assessment of a 12” Pipeline
Challenge The 12″ pipeline runs refined product in the terminal. The pipeline is 1.123 km…
-
Find out more2019 Annual Technical Integrity Assessment Reports
Challenge To provide an Annual Technical Integrity Assessment (TIA) report covering the year 2019 operations…
-
Find out more2016 Annual Technical Integrity Assessment Reports
Challenge To provide Technical Integrity Assessment (TIA) report covering latest year of integrity management (2016)…
-
Find out moreIntegrity Management and Compliance with Regulatory Requirements
Challenge An offshore operator has developed a field as a tieback. The pipeline system consists…



